A smart locker deployment needs more than delivered cabinets. Placement, available power, connectivity, access rules and the intended handoff process should be planned with facilities and the system administrator. This article explains Jendy’s approach to coordinating Koloni / Accessa smart locker installation.
Define the locker workflow
Identify who will use the lockers, how access is administered and what the handoff process should look like. Review the manufacturer’s current smart locker product information and confirm the selected Koloni configuration against the organization’s storage and operating requirements before scheduling installation.
Prepare the installation location
Review available space, delivery access, mounting or placement requirements, power and connectivity with facilities. Keep the equipment provider’s requirements and the approved field scope aligned.
Test the agreed use case
Coordinate platform setup and authorized administration with the responsible team. Review the intended user workflow, document installed equipment and identify support ownership and outstanding tasks at closeout.
Related Installation Resources
Continue planning with structured cabling and security system design and planning. For a quote, submit your installation scope with the site locations, device quantities and planned schedule.
Download the Planning Guide
Save this companion guide for your project team: download the Smart security lockers planning a nationwide deployment whitepaper (PDF). Downloads are free and require no form or email address. Browse our security installation resource library for more guides.
For facility-specific planning, explore our security for large facilities guidance.
